Well integrity

Seawell has developed a range of cutting-edge technologies aimed at securing and managing integrity throughout the well's lifecycle

Our well integrity technologies address three key challenges - cemented annulus integrity, integrity diagnostics and well suspension.

In the construction phase, our Cflex family of stage tools provide a gas-tight solution for precision primary or secondary stage cementing. Unprecedented flexibility is offered through multiple open/close valve technology and the option to install in one or more casing or liner sections. In addition, there is no compromise to the ID and OD of the string.

Our ground-breaking Point™ system is the most efficient and accurate integrity diagnostic resource in the industry.
And, for secure temporary well suspension, or permanent abandonment without the use of cement, our VMB well barrier plugs are multi-set, retrievable and rated gas tight under ISO 14310 V0 - enabling operators to enjoy more flexibility and far greater security.

20.05.2010 13:25:45
Gullfaks_476 cropped